Construction contracts serve as the cornerstone of any building project, laying out the terms, conditions, and responsibilities of all parties involved. Whether you’re a contractor, subcontractor, owner, or consultant, understanding the intricacies of these agreements is crucial for ensuring a smooth and successful project completion.
In this detailed blog, we’ll delve into key takeaways to help you know more about the key types of construction contracts.
Looking for Construction Management Software? Check out SoftwareSuggest’s list of the best Construction Management Software solutions.
What Is a Construction Contract?
A construction contract is a crucial legal document that defines the terms and conditions governing a construction project. It serves as a comprehensive agreement between the parties involved, including the client, contractor, subcontractors, and suppliers. Within this contract, details such as the scope of work, project timeline, payment terms, and responsibilities of each party are clearly outlined. These provisions help prevent misunderstandings and disputes throughout the construction process.
Additionally, the contract typically includes clauses for handling changes to the project scope, ensuring that any modifications are properly documented and agreed upon. Quality standards for materials and workmanship are also specified to maintain the desired level of construction quality.

Before selecting any type of contract to execute, ensure you are aware of its different types and their impact. This can help you better streamline your business processes. Ensure you analyze the benefits and drawbacks of each type of construction contract.
Different Types of Construction Contracts
Here’s a breakdown of different types of contracts in construction, along with their pros and cons, to help you better understand construction contracts –
1. Lump-Sum Contract
A lump-sum contract is a type of agreement in the construction industry where the contractor agrees to complete a project for a fixed total price. This total price is determined before the construction work begins and is based on the contractor’s estimate of the total cost of materials, labor, overhead, profit, and any other expenses associated when building contracts.
- Since the total price is agreed upon upfront, the client knows exactly how much they will be paying for the project, providing cost certainty and helping with budgeting.
- The client bears minimal risk in terms of cost overruns or unexpected expenses, as the contractor is responsible for completing the project within the agreed budget.
- Lump-sum contracts typically involve a single payment or a series of predetermined payments at specified milestones, making the payment process simpler and more straightforward for both parties.
- Lump-sum contracts often include detailed specifications and plans, clearly defining the scope of work and minimizing disputes over project requirements.
- Once the contract is signed and the price is fixed, any changes to the scope of work or project requirements may result in additional costs or disputes between the client and the contractor.
- The contractor bears the risk of cost overruns and unexpected expenses, as they are obligated to complete the project within the agreed budget, even if unforeseen issues arise during construction.
- Lump-sum contracts may not be suitable for projects with high levels of uncertainty or complexity, as accurately estimating the total cost upfront can be challenging.
- Since the client has less involvement in the day-to-day management of the project compared to other contract types, there may be less opportunity for input or control over the construction process.
2. Cost-Plus Contract
A cost-plus contract is a type of agreement commonly used in the construction industry where the client agrees to reimburse the contractor for the actual costs of construction plus an additional fee or percentage of profit. Unlike lump-sum contracts, where the total price is fixed, cost-plus contracts allow for more flexibility in terms of project scope and expenses.
- Cost-plus contracts offer flexibility in project scope and design changes since the final cost is not predetermined. This can be beneficial for projects with evolving requirements or uncertain conditions.
- Clients have transparency into the actual costs incurred during construction, as they are responsible for reimbursing the contractor for expenses. This transparency can help build trust between the client and contractor.
- The risk of cost overruns and unforeseen expenses is shared between the client and the contractor in cost-plus contracts. Since the client reimburses the contractor for actual costs, the contractor is not solely responsible for absorbing additional expenses.
- Contractors have an incentive to control costs and manage resources efficiently in cost-plus contracts since their profit is often tied to a percentage of the project’s total cost. This can lead to a focus on delivering high-quality workmanship and materials.
- Since the final cost of the project is not determined upfront, clients may face uncertainty about the total project cost, which can make budgeting and financial planning more challenging.
- Disputes may arise between the client and contractor over the reasonableness of expenses, the accuracy of cost estimates, or the extent of allowable overhead and profit. This can lead to delays and strained relationships.
- Without a fixed price, cost-plus contracts may incentivize contractors to maximize costs to increase their profit margin. This can lead to inefficiencies and inflated project expenses if not properly managed.
- Cost-plus contracts require careful administration and documentation of project costs to ensure transparency and accountability. Managing and verifying expenses can be time-consuming and may require additional resources.
3. Time and Materials (T&M) Contract
A Time and Materials (T&M) contract is a type of agreement commonly used in the construction industry where the client pays the contractor based on the time spent and the materials used to complete the project. Unlike lump-sum or cost-plus contracts, where the price is fixed or determined by actual costs plus a fee, T&M contracts provide more flexibility by allowing for payment based on actual hours worked and materials consumed.
- T&M contracts offer flexibility in project scope and duration since the final cost is not predetermined. This can be advantageous for projects with evolving requirements or uncertain conditions.
- Clients have transparency into the actual costs incurred during construction, as they are responsible for reimbursing the contractor for labor hours and materials used. This transparency can help build trust between the client and contractor.
- Clients have direct control over project expenses in T&M contracts since they approve and reimburse costs on an ongoing basis. This allows for more immediate feedback and adjustments to the project budget.
- Contractors have an incentive to work efficiently and minimize project costs in T&M contracts since their compensation is based on actual hours worked and materials used. This can lead to a focus on productivity and cost-saving measures.
- Since the final cost of the project is not determined upfront, clients may face uncertainty about the total project cost, which can make budgeting and financial planning more challenging.
- Without a fixed price or predetermined cost limits, there is a risk that contractors may overbill for labor hours or materials used, leading to inflated project expenses if not properly managed.
- T&M contracts require careful administration and documentation of labor hours and material costs to ensure transparency and accountability. Managing and verifying expenses can be time-consuming and may require additional resources.
- Without a fixed scope of work, there is a risk of scope creep in T&M contracts, where the project gradually expands beyond its original boundaries. This can result in additional costs and project delays if not carefully managed.
You May Also Read: Key Functions of Construction Management and How to Manage Them
4. Design-Build Contract
A Design-Build contract is a project delivery method where the client enters into a single contract with a single entity, known as the design-builder, to provide both the design and construction services for a project. In a Design-Build arrangement, the design-builder is responsible for both the architectural and engineering design as well as the actual construction of the project.
- Design-Build contracts offer clients a single point of responsibility for both the design and construction phases of the project.
- Since the design and construction phases overlap in Design-Build contracts, projects can often be completed more quickly compared to traditional project delivery methods.
- Design-Build contracts foster collaboration between designers and builders from the outset of the project, promoting innovative design solutions and construction techniques.
- Clients have reduced administrative burden in Design-Build contracts since they only need to manage and coordinate with a single entity rather than multiple contractors, architects, and engineers.
- Clients may have limited control over the design process in Design-Build contracts, as the design-builder assumes responsibility for developing the project design.
- Design-Build contracts typically involve selecting a single entity through a qualifications-based selection process rather than competitive bidding.
- Since the design and construction phases overlap in Design-Build contracts, design changes during construction may be more challenging and costly to implement compared to traditional project delivery methods.
- Clients may bear more risk in Design-Build contracts compared to traditional project delivery methods, as they rely on the design-builder to manage both the design and construction aspects of the project.
5. Unit Price Contract
A Unit Price Contract, also known as a Schedule of Rates Contract or a Measure and Value Contract, is a procurement method commonly used in construction projects where the contractor is paid based on the quantities of work completed at predetermined unit prices. Under this type of contract, the client agrees to pay the contractor for the actual quantities of work performed, multiplied by the unit prices specified in the contract.
- Unit Price Contracts offer flexibility in project scope and duration since the final cost is determined based on the actual quantities of work completed.
- Unit Price Contracts allow for accurate cost control, as the client only pays for the actual quantities of work completed.
- Contractors have an incentive to work efficiently and minimize project costs in Unit Price Contracts since their compensation is directly tied to the quantities of work completed.
- Unit Price Contracts require detailed measurement and quantification of work items, which can help ensure that both parties have a clear understanding of the scope of work and the basis for payment.
- Since the final cost of the project is determined based on actual quantities of work completed, clients may face uncertainty about the total project cost until all work is finished.
- Disputes may arise between the client and contractor over the measurement and quantification of work items, particularly for complex or subjective tasks.
- Unit Price Contracts require careful administration and documentation of quantities of work completed to ensure accurate payment. Managing and verifying measurements can be time-consuming and may require additional resources.
- There is a risk that contractors may overbill for quantities of work completed, particularly if measurement processes are not adequately monitored or if there is a lack of transparency in the billing process.
You May Also Read: 8 Benefits of Construction Material Management
6. Guaranteed Maximum Price Contract
A Guaranteed Maximum Price (GMP) contract is a type of agreement often used in construction projects where the contractor agrees to complete the project for a price that does not exceed a specified maximum amount. Under a GMP contract, the contractor is typically responsible for completing the project within the agreed-upon budget, and any cost savings below the maximum price may be shared between the contractor and the client.
- GMP contracts provide clients with cost certainty, as they know the maximum amount they will have to pay for the project.
- GMP contracts often involve sharing the risk of cost overruns between the client and the contractor. If the project costs exceed the maximum price, the contractor is typically responsible for covering the additional expenses, incentivizing them to manage costs efficiently.
- GMP contracts promote collaboration between the client and the contractor, as both parties work together to establish the maximum price and manage project costs.
- GMP contracts offer flexibility in project scope and design changes as long as the changes do not exceed the maximum price.
- GMP contracts can be complex to negotiate and administer, as they require careful consideration of project scope, cost estimates, and risk allocation. Misunderstandings or disputes over contract terms can lead to delays and additional costs.
- Disputes may arise between the client and the contractor over the interpretation of contract terms, the reasonableness of costs, or responsibility for unforeseen conditions. Resolving disputes can be time-consuming and may strain the client-contractor relationship.
- Despite the maximum price limit, there is still a risk of cost overruns in GMP contracts if the contractor underestimates the project costs or encounters unforeseen challenges during construction. Clients may face additional expenses if the project exceeds the agreed-upon maximum price.
- Contractors may pad their cost estimates to ensure they have a buffer against potential cost overruns, leading to higher initial project costs for the client.
7. Incentive Construction Contracts
Incentive Construction Contracts are agreements between the client and the contractor that include incentives or penalties based on the contractor’s performance in meeting certain project objectives, such as completing the project ahead of schedule, achieving cost savings, or maintaining high-quality standards. These contracts are designed to motivate the contractor to perform at a higher level and achieve specific project goals.
- By aligning the interests of the client and the contractor, Incentive Construction Contracts promote collaboration and cooperation throughout the project lifecycle.
- Incentive Construction Contracts can result in cost savings for the client if the contractor successfully completes the project under budget or identifies opportunities for value engineering.
- Incentive Construction Contracts encourage contractors to complete the project ahead of schedule by offering incentives for early completion.
- Incentive Construction Contracts promote a focus on quality and craftsmanship by offering rewards for meeting or exceeding specified quality standards. Contractors are motivated to deliver high-quality work to earn incentives, resulting in better outcomes for the client.
- Incentive Construction Contracts can be complex to negotiate and administer, as they require careful consideration of project objectives, performance metrics, and reward structures.
- Contractors may engage in gaming behavior to maximize their rewards under Incentive Construction Contracts, such as manipulating performance metrics or cutting corners to achieve short-term gains.
- Incentive Construction Contracts may incentivize contractors to increase project costs to maximize their rewards, particularly if the incentives are tied to project expenses.
- Clients may face higher costs if the contractor prioritizes earning incentives over cost savings.
You May Also Read: What Is Construction Planning? Definition, Types and Steps
8. Integrated Project Delivery (IPD) contract
An Integrated Project Delivery (IPD) contract is a collaborative agreement between the owner, designer, and builder to work together as a cohesive team to deliver a construction project. In an IPD contract, all parties share risks and rewards, and decisions are made collectively with the goal of optimizing project outcomes.
- IPD contracts promote collaboration among all project stakeholders, including the owner, architect, engineer, contractor, and subcontractors.
- IPD contracts involve all stakeholders from the early stages of the project, allowing for input and expertise to be integrated into the project design and planning process. Early involvement helps identify potential challenges, mitigate risks, and optimize project performance.
- In IPD contracts, risks and rewards are shared among all project stakeholders.
- IPD contracts promote integrated decision-making, with decisions made collectively by the project team based on consensus and mutual agreement.
- IPD contracts can be complex to negotiate and administer due to the high level of collaboration and integration required among multiple stakeholders. Coordinating decision-making, managing relationships, and resolving conflicts may require additional time and resources.
- Stakeholders may need to adapt to new ways of working, sharing information, and making decisions collaboratively, which can pose challenges and resistance.
- IPD contracts may involve greater uncertainty in project costs and schedules compared to traditional contracts, particularly during the early stages of the project when key decisions are being made collaboratively.
- IPD contracts may raise legal and liability considerations related to risk allocation, insurance coverage, and contractual obligations among project stakeholders.
Conclusion
Upon concluding the construction contract, both parties solidify their commitments and expectations. This legally binding agreement delineates project scope, timelines, budgetary allocations, and quality standards. It establishes a framework for collaboration, ensuring clarity on roles, responsibilities, and dispute resolution mechanisms.
Moreover, it safeguards the interests of both the client and the contractor, mitigating potential risks and uncertainties. By finalizing this contract, stakeholders pave the way for a smooth execution phase, fostering trust and accountability throughout the construction process. Adherence to the terms outlined herein facilitates successful project completion, delivering desired outcomes and fulfilling contractual obligations to the satisfaction of all involved parties.
A construction contract typically comprises five essential elements crucial for clarity and legal protection. Firstly, the contract must outline the identities of the involved parties, including the client and contractor. Secondly, it delineates the scope of work, specifying tasks, materials, and project timelines. Lastly, the contract stipulates the payment terms, including cost breakdowns, milestones, and any penalties or incentives.
Four common types of standard construction contracts are:
- Lump Sum or Fixed Price Contracts: Agreed-upon set price for the entire project.
- Cost-Plus Contracts: Cover actual costs plus an agreed fee.
- Time and Materials Contracts: Pay for time and materials used.
- Unit Price Contracts: Payment based on predefined units of work.
Choosing the right construction contract depends on project details, risk sharing, and client needs. Lump sum contracts offer clarity and a fixed price upfront, ensuring budget certainty and efficient completion. Cost-plus contracts provide transparency but may lead to higher costs. Ultimately, the ideal contract type balances project complexity, budget, and risk for successful delivery.

Supriya is a highly skilled content writer with over 8 years of experience in the SaaS domain. She believes in curating engaging, informative, and user-friendly content to simplify highly technical concepts. With an expansive portfolio of long-format blogs, newsletters, whitepapers, and case studies, Supriya is dedicated to staying in touch with emerging SaaS trends to produce relevant and reliable content.